How to Successfully Complete a Construction or Renovation Project with an Architect

A construction or renovation project with an architect involves several months of work, a range of professionals and regulatory frameworks that can…

Architecte femme examinant des plans de construction dans un studio moderne, projet de rénovation architecturale

A construction or renovation project with an architect involves several months of work, a range of contractors and regulatory frameworks that can vary depending on the nature of the work. Before comparing quotes, the key question is what exactly you expect from the architect and what the contract should cover to avoid any gray areas once work is underway.

Phased renovation: anticipating technical incompatibilities

Renovating a home while continuing to live in it means dividing the work into successive phases. This phased approach may seem practical, but it can create real risks if the project has not been considered as a whole from the outset.

The first pitfall concerns energy efficiency. Each phase of work must fit into an overall thermal strategy, defined before the first shovel hits the ground. For example, insulating the roof in phase 1 and then replacing the windows and doors in phase 3 can change ventilation requirements between the two stages. Without proper planning, the system installed in phase 1 may no longer be suitable after phase 3.

Some work can also trigger an insulation requirement: roof repairs or façade renovation may require the relevant surface to be insulated, unless this is technically impossible, economically disproportionate or restricted by heritage requirements. This must be identified when defining the project scope, before even requesting quotes from contractors.

This is where the architect plays a coordinating role that homeowners cannot manage on their own. They draw up a master plan setting out the order of work, the interfaces between trades and the checks to be carried out at the end of each phase. A firm such as the one featured at https://batir-architecte.com illustrates this kind of end-to-end support, from initial design through to overseeing the different phases of work.

Architect and clients at a residential construction site, discussing the project plans

RE2020 and existing buildings: two regulatory frameworks for one project

A project combining the renovation of an existing building with a new extension does not fall under a single set of regulations. The new-build section may be subject to RE2020, while the existing building is governed by separate rules. The architect and thermal engineering consultancy must work together to ensure these requirements are coordinated, particularly for shared systems such as heating, ventilation and hot water production.

Criterion Existing building (renovation) New extension (RE2020)
Applicable thermal regulations Thermal regulations for existing buildings RE2020 (depending on the extension’s characteristics)
Insulation requirement triggered May apply during façade renovation or roof repairs Built into the design from the outset
Completion certificate Varies depending on the scope of the work Issued by an authorized professional independent of the client
Key date Work start date Date the permit application is submitted

One detail that is often overlooked: RE2020 carbon requirements change over time, and the applicable period depends on the date the permit application is submitted, not on when work actually begins. A design process that runs longer than expected or a permit application delayed by a few months can therefore change the thresholds that must be met. The architect should factor this regulatory timeline into the design schedule.

Architect’s contract: defining the scope beyond site supervision

Most homeowners associate architects with designing plans and overseeing construction. The contractual reality is more nuanced. The architect’s scope of work should be clearly defined, even when they are not managing the construction.

The Architecture Act (Law No. 77-2 of January 3, 1977, Article 3) provides that the client must allow the architect, under the terms set out in the contract, to ensure that the construction documents and work in progress comply with the architectural design. The architect must be notified of any deviations identified.

In practice, this means the contract should spell out three points that are often left unclear:

  • Site access arrangements and the frequency of visits, even under a limited scope of work (design only or no construction management)
  • The process for raising concerns if a contractor changes the design, and the architect’s expected response time
  • How responsibilities are divided if the client decides to manage certain trades themselves without the architect overseeing the work

A contract that simply refers to a “full-service” or “limited” scope without clarifying these points leaves room for disputes. The time spent drafting these clauses upfront can save months of legal wrangling later.

Meeting with an interior architect to choose materials for an apartment renovation project

Project handover and compliance checks: two separate steps

Handover marks the transfer of responsibility from the contractors to the client. It is the formal act by which the client accepts the completed work, with or without reservations. If the architect is engaged for this stage, they prepare the handover report and check that any outstanding items have been addressed.

RE2020 compliance is covered by a separate certificate, issued by an authorized professional independent of the client. This check is distinct from both the permit application and day-to-day site supervision. It should be included in the handover schedule to avoid a gap between the home’s completion and receipt of the certificate.

In practice, the architect can include this step in the overall schedule from the design phase onward. Waiting until construction is complete to address it can lead to costly remedial work if measured performance does not match the initial calculations.

The difference between a well-managed project and one that gets out of hand rarely comes down to the quality of the materials or the choice of contractor. It comes down to a precise contract, anticipating regulatory requirements and treating each phase as part of a coherent whole.